Back To: Utility Department
WATER
3/4 inch line
1 inch line
1 1/2 inch line
2 and 3 inch line
* Capital Reimbursement Charge Per ERU
$ 2,000
$ 2,500
$ 3,000
$ 3,500
$ 1,565
*The capital reimbursement charge will be assessed on all new or increased connections to the water supply system except for existing lots within the City limits which were platted before January 1, 2001 and is calculated on the number of Equivalent Residential Units (ERU’s).
SEWER
Connection Change Per ERU
*Capital Reimbursement Charge Per ERU
TOTAL Per ERU
$ 9,196
$ 3,938
___________
$ 13,134
*The capital reimbursement charge will be assessed on all new or increased connections to the sewer system and is calculated on the number of Equivalent Residential Units (ERU’s).